Contributions to Conferences & Workshops

Talks

4th JPARC Symposium, 2024 High Power Slow Extraction for BDF/SHiP at the CERN SPS M. Fraser CERN-HI-ECN3-SLIDES-2024-003
13th International Workshop on Neutrino Beams and Instrumentation (NBI2024), 2024 Design considerations for the BDF/SHiP production target R. Franqueira Ximenes CERN-HI-ECN3-CONF-2024-004
13th International Workshop on Neutrino Beams and Instrumentation (NBI2024), 2024 BDF target station design J.-L. Grenard CERN-HI-ECN3-CONF-2024-003
13th International Workshop on Neutrino Beams and Instrumentation (NBI2024), 2024 The new ECN3 high intensity facility for the BDF/SHiP experiment and high intensity beam transfer M. Fraser CERN-HI-ECN3-CONF-2024-002
13th International Workshop on Neutrino Beams and Instrumentation (NBI2024), 2024 Radiation Protection Considerations for HI-ECN3 C. Ahdida CERN-HI-ECN3-CONF-2024-001
SATIF-16 2024 16th Workshop on Shielding aspects of Accelerators, Targets and Irradiation Facilities (SATIF-16)   CERN Document Server
HPTW 2023 Radiation protection studies for a high intensity facility in the CERN's ECN3 area C. Ahdida et al. CERN Document Server
HB2023 Latest Advances in Targetry Systems at CERN and Exciting Avenues for Future Endeavours R. Franqueira Ximenes et al. JACoW
IWSMT-15 2023 Beam Dump Facility production target at CERN and advanced cladding technological R&D    
IWSMT-15 2023 Post Irradiation Examination of the protype production target materials of the Beam Dump Facility (BDF) at CERN    
NURETH19 Loss-of-coolant-accident Study For The Beam Dump Facility At Cern    
SATIF-14 2018 A Beam Dump Facility (BDF) at CERN – The Concept and a First Radiological Assessment C. Ahdida et al. CERN Document Server

 

Proceedings 

IPAC 2024 paper Optics rematching between TT24 and P42 primary beam lines within the HI-ECN3 study project at CERN A. Gorn et al. CERN Document Server
IPAC 2023 paper RF techniques for spill quality improvement in the SPS P.A. Arrutia Sota et al. CERN Document Server
IPAC 2023 paper Investigating the feasibility of delivering higher intensity proton beams to ECN3 at the CERN SPS North Area M. Fraser et al. CERN Document Server
IPAC 2023 paper Target systems design for a high intensity facility in the CERN's ECN3 area R. Franqueira Ximenes et al. CERN Document Server
IPAC 2023 paper Design development and technological R&D for niobium-cladded beam production targets T. Griesemer et al. JACoW
IPAC 2021 paper CERN BDF Prototype Target Operation, Removal and Autopsy Steps R. Franqueira Ximenes et al. CERN Document Server
IPAC 2019 paper Update on beam transfer line design for the SPS Beam Dump Facility Y. Dutheil et al. CERN Document Server
IPAC 2019 paper SPS slow extraction losses and activation: update on recent improvements M. Fraser et al. CERN Document Server
IPAC 2018 Beam Dump Facility Target: Design Status and Beam Tests in 2018 E. Lopez Sola et al. CERN Document Server
IPAC 2017 The SPS Beam Dump Facility M. Lamont et al. CERN Document Server